Reconstruction, rationalization and maintenance of public lighting in inhabited places of Odžaci Municipality
- Guaranteed annual savings 1.275.447,87 kWh or 76,57%
- Total energy savings project 19.131.733,01 kWh
- The project reduces CO2 emissions by 76,57% or a total of 21.025,77 tons of CO2
- Implemented a total of 3.954 luminaires and 82 control systems for remote control
- Technology – Schreder LED luminaires
- Project’s Status – Project in the guarantee phase
- Currently – savings being achieved in the project:
%
BETTER LIGHTING
- Preparation phase 100%
- Implementation phase 100%
- Guaranteeing phase 8.87%
%
Saving electricity
Impact of the project on environmental protection:
76,57% reduction CO2 emission or a total 21.025,77 tons of CO2