Project Stara Pazova
Reconstruction, rationalization and maintenance of public lighting in inhabited places of Stara Pazova Municipality
  • Guaranteed annual savings 4.400.063,66 kWh or  82% of
  • Total energy savings projects 57.200.827,58 kWh
  • The project reduces CO2 emissions by 82% or a total of 62.863,71 tons of CO2
  • Implemented a total of 8.328 luminaires and 179 control systems for remote control
  • Technology -Schréder LED luminaires
  • Project’s Status – Project in the guarantee phase
  • Currently – savings being achieved in the project:

%

BETTER LIGHTING

  • Preparation phase 100% 100%
  • Implementation phase 100% 100%
  • Guaranteeing phase 38.27% 38.27%

%

Saving electricity

Impact of the project on environmental protection:
82%  reduction CO2 emission or a total  62.863,71 tons of  CO2

SMART ENERGY INVESTMENT

A reliable partner to Local-Self Governments in raising the level of public lighting services