Project Subotica
Reconstruction, rationalization and maintenance of public lighting in inhabited places of Subotica Municipality
- Guaranteed annual savings 4.154.030,99 kWh or 73% of
- Total energy savings project 54.002.402,87 kWh
- The project reduces CO2 za 73% emissions by 59.348,64 tons of CO2
- Implemented in total 12.914 luminaires and 269 control systems for remote control
- Technology -Schréder LED Luminaires
- Project’s Status – Project in the guarantee phase
- Currently – savings being achieved in the project:
%
BETTER LIGHTING
- Preparation phase 100%
- Implementation phase 100%
- Guaranteeing phase 30.57%
%
Saving electricity
Impact of the project on environmental protection:
73% reduction CO2 emission or a total 28.621,27 tons of CO2