Project Subotica

Reconstruction, rationalization and maintenance of public lighting in inhabited places of Subotica Municipality 

  • Guaranteed annual savings 4.154.030,99 kWh or 73% of
  • Total energy savings project 54.002.402,87 kWh
  • The project reduces CO2 za 73% emissions by 59.348,64 tons of CO2
  • Implemented in total 12.914 luminaires and 269 control systems for remote control
  • Technology -Schréder LED Luminaires
  • Project’s Status – Project in the guarantee phase
  • Currently – savings being achieved in the project:

%

BETTER LIGHTING

  • Preparation phase 100% 100%
  • Implementation phase 100% 100%
  • Guaranteeing phase 30.57% 30.57%

%

Saving electricity

Impact of the project on environmental protection:
73% reduction CO2 emission or a total 28.621,27 tons of CO2

SMART ENERGY INVESTMENT

A reliable partner to Local-Self Governments in raising the level of public lighting services