Project Veliko Gradište
Reconstruction, rationalization and maintenance of public lighting in inhabited places of Veliko Gradište Municipality
  • Guaranteed annual savings 781.497,56kWh or 76% of
  • Total energy savings projects 11.722.463,4 kWh
  • The project reduces CO2 emissions by 76% or a total of 12.882,99 tons of CO2
  • Implemented a total of 1.643 luminaires and 20 control systems for remote control.
  • Technology -Schréder LED luminaires
  • Project’s Status – Project in the guarantee phase
  • Currently – savings being achieved in the project:

%

BETTER LIGHTING

  • Preparation phase 100% 100%
  • Implementation phase 100% 100%
  • Guaranteeing phase 42.76% 42.76%

%

Saving electricity

Impact of the project on environmental protection:
76% reduction CO2 emission or a total 12.882,99 tons of CO2

 

SMART ENERGY INVESTMENT

A reliable partner to Local-Self Governments in raising the level of public lighting services