Project Veliko Gradište
Reconstruction, rationalization and maintenance of public lighting in inhabited places of Veliko Gradište Municipality
- Guaranteed annual savings 781.497,56kWh or 76% of
- Total energy savings projects 11.722.463,4 kWh
- The project reduces CO2 emissions by 76% or a total of 12.882,99 tons of CO2
- Implemented a total of 1.643 luminaires and 20 control systems for remote control.
- Technology -Schréder LED luminaires
- Project’s Status – Project in the guarantee phase
- Currently – savings being achieved in the project:
%
BETTER LIGHTING
- Preparation phase 100%
- Implementation phase 100%
- Guaranteeing phase 42.76%
%
Saving electricity
Impact of the project on environmental protection:
76% reduction CO2 emission or a total 12.882,99 tons of CO2