Project Vlasotince
Reconstruction, rationalization and maintenance of public lighting in inhabited places of Vlasotince Municipality
  • Guaranteed annual savings 1.805.223.27 kWh or 85% of
  • Total energy savings project 21.662.679,20 kWh
  • The project reduces CO2 emissions by 85% or a total of  23.807,28 tons of CO2
  • Implemented a total of 3.800 luminaires and 88 control systems for remote control
  • Technology -Schréder LED luminaires
  • Project’s Status – Project in the guarantee phase
  • Currently – savings being achieved in the project:

%

BETTER LIGHTING

  • Preparation phase 100% 100%
  • Implementation phase 100% 100%
  • Guaranteeing phase 49.71% 49.71%

%

Saving electricity

Impact of the project on environmental protection:
85% reduction CO2 emission or a total 23.807,28 tons of CO2

SMART ENERGY INVESTMENT

A reliable partner to Local-Self Governments in raising the level of public lighting services