Project Zaječar

Reconstruction, rationalization and maintenance of public lighting in inhabited places of Zaječar Municipality

  • Guaranteed annual savings 4.731.108,18 kWh or 83%
  • Total energy savings project 70.966.622,70 kWh
  • The project reduces CO2 emissions by 83% or a total of 77.992,32 tons of CO2
  • Implemented a total of 9.554 luminaires and 274 control systems for remote control
  • Technology –Schreder and Philips LED luminaires
  • Project’s Status – Project in the guarantee phase
  • Currently – savings being achieved in the project:

%

BETTER LIGHTING

  • Preparation phase 100% 100%
  • Implementation phase 100% 100%
  • Guaranteeing phase 22.76% 22.76%

%

Saving electricity

Impact of the project on environmental protection:
83% reduction CO2 emission or a total 70.966.622,70 tons of CO2

SMART ENERGY INVESTMENT

A reliable partner to Local-Self Governments in raising the level of public lighting services